Manufacturer of Urea molding compound production machines
Order(MOQ):
1Payment:
LC, TTProduct Origin:
ChinaColor:
CustomizationShipping Port:
Shanghai PortJohnley Amino Plastic Machinery & Equipment Factor
Complete Equipment for Urea Molding Compound Production
Main Procedure 1. Inspect the site: Evaluate the entire equipment engineering and plan the factory layout. 2. Submit the feasibility report: Include relevant charts and tables to support the analysis. 3. Contract and production: Once the contract is signed, start manufacturing the agreed-upon equipment, which usually takes 2 - 3 months. 4. Install and test: Set up the equipment and conduct commissioning to ensure proper operation. 5. On-site guidance and training: Provide operation guidance and train the staff for about 2 - 3 months.
Specifications
Items |
(300days/24h ) Capacity |
(KW) Installed Power |
Area |
Steam Consumption /1 ton |
Actual Power Consumption /1 ton |
Urea molding compound production line |
6000 ton |
419.25 |
700 |
1.5kwh |
250 kWh |