Under normal circumstances, the entire installation process takes 2-3 months. Johnley Factoryprofessional engineer and technician team are on site to guide installation and help train operators.
Look, the mesh belt dryerhas been installed in place, and other machines are being planned and installed one after another.
Johnley Factory can design, manufacture and install complete amino forming lines.
Our services include plant design, equipment layout design, complete equipment manufacturing, on-site installation of process piping, electrical control and cable routing installation.